FigureThePour

Concrete for a 12x20 Slab

A 12x20 slab at 4" thick needs
2.96 cu yd

Order 3.26 yd with 10% waste — or 134 × 80 lb bags / 178 × 60 lb bags.

By thickness

ThicknessCubic yards+10% waste80 lb bagsTypical use
4"2.963.26134Patio, shed pad, walkway
5"3.704.07167Light vehicle traffic
6"4.444.89200Driveway, garage

Bags or the truck?

For this 240 sq ft slab at 4": bags ≈ $871 (134 × 80 lb — that's 10,720 lb of mixing) vs ready-mix ≈ $534 delivered. The truck wins here. Prices are national ballparks — your local quote rules.

Adjust the numbers

Concrete needed
2.96 cu yd

134 × 80 lb bags | with waste: 3.26 cu yd

Common questions

How much concrete do I need for a 12x20 slab?

A 12x20 slab at the standard 4-inch thickness needs 2.96 cubic yards of concrete — order 3.26 yards with a 10% waste margin. At 6 inches it needs 4.44 yards.

How many bags of concrete for a 12x20 slab?

At 4 inches thick: 134 bags of 80 lb concrete mix or 178 bags of 60 lb. At this volume, delivered ready-mix is usually cheaper and far less work than mixing bags.

Should I use bags or ready-mix for a 12x20 slab?

Ready-mix. Bags for this slab would cost about $871 in material and require mixing 10,720 lb by hand; a delivered order runs roughly $534 and arrives ready to pour.

Nearby sizes

15x15 slab2.78 cu yd at 4"16x16 slab3.16 cu yd at 4"10x20 slab2.47 cu yd at 4"14x20 slab3.46 cu yd at 4"