Concrete for a 20x24 Slab

A 20x24 slab at 4" thick needs
5.93 cu yd

Order 6.52 yd with 10% waste — or 267 × 80 lb bags / 356 × 60 lb bags.

By thickness

ThicknessCubic yards+10% waste80 lb bagsTypical use
4"5.936.52267Patio, shed pad, walkway
5"7.418.15334Light vehicle traffic
6"8.899.78400Driveway, garage

Bags or the truck?

For this 480 sq ft slab at 4": bags ≈ $1,736 (267 × 80 lb — that's 21,360 lb of mixing) vs ready-mix ≈ $919 delivered. The truck wins here. Prices are national ballparks — your local quote rules.

Adjust the numbers

Concrete needed
5.93 cu yd

267 × 80 lb bags | with waste: 6.52 cu yd

Common questions

How much concrete do I need for a 20x24 slab?

A 20x24 slab at the standard 4-inch thickness needs 5.93 cubic yards of concrete — order 6.52 yards with a 10% waste margin. At 6 inches it needs 8.89 yards.

How many bags of concrete for a 20x24 slab?

At 4 inches thick: 267 bags of 80 lb concrete mix or 356 bags of 60 lb. At this volume, delivered ready-mix is usually cheaper and far less work than mixing bags.

Should I use bags or ready-mix for a 20x24 slab?

Ready-mix. Bags for this slab would cost about $1,736 in material and require mixing 21,360 lb by hand; a delivered order runs roughly $919 and arrives ready to pour.