FigureThePour

Concrete for a 4x4 Slab

A 4x4 slab at 4" thick needs
0.20 cu yd

Order 0.22 yd with 10% waste — or 9 × 80 lb bags / 12 × 60 lb bags.

By thickness

ThicknessCubic yards+10% waste80 lb bagsTypical use
4"0.200.229Patio, shed pad, walkway
5"0.250.2712Light vehicle traffic
6"0.300.3314Driveway, garage

Bags or the truck?

For this 16 sq ft slab at 4": bags ≈ $59 (9 × 80 lb — that's 720 lb of mixing) vs ready-mix ≈ $106 delivered. Bags are competitive at this size. Prices are national ballparks — your local quote rules.

Adjust the numbers

Concrete needed
0.20 cu yd

9 × 80 lb bags | with waste: 0.22 cu yd

Common questions

How much concrete do I need for a 4x4 slab?

A 4x4 slab at the standard 4-inch thickness needs 0.20 cubic yards of concrete — order 0.22 yards with a 10% waste margin. At 6 inches it needs 0.30 yards.

How many bags of concrete for a 4x4 slab?

At 4 inches thick: 9 bags of 80 lb concrete mix or 12 bags of 60 lb. At this size, bags are a reasonable DIY option.

Should I use bags or ready-mix for a 4x4 slab?

Either works at this size. Bags cost about $59; ready-mix about $106 after the short-load fee. Bags save money if your time is free; the truck saves your weekend.

Nearby sizes

5x5 slab0.31 cu yd at 4"4x8 slab0.40 cu yd at 4"6x6 slab0.44 cu yd at 4"6x8 slab0.59 cu yd at 4"