FigureThePour

Concrete for a 8x10 Slab

A 8x10 slab at 4" thick needs
0.99 cu yd

Order 1.09 yd with 10% waste — or 45 × 80 lb bags / 60 × 60 lb bags.

By thickness

ThicknessCubic yards+10% waste80 lb bagsTypical use
4"0.991.0945Patio, shed pad, walkway
5"1.231.3656Light vehicle traffic
6"1.481.6367Driveway, garage

Bags or the truck?

For this 80 sq ft slab at 4": bags ≈ $293 (45 × 80 lb — that's 3,600 lb of mixing) vs ready-mix ≈ $228 delivered. The truck wins here. Prices are national ballparks — your local quote rules.

Adjust the numbers

Concrete needed
0.99 cu yd

45 × 80 lb bags | with waste: 1.09 cu yd

Common questions

How much concrete do I need for a 8x10 slab?

A 8x10 slab at the standard 4-inch thickness needs 0.99 cubic yards of concrete — order 1.09 yards with a 10% waste margin. At 6 inches it needs 1.48 yards.

How many bags of concrete for a 8x10 slab?

At 4 inches thick: 45 bags of 80 lb concrete mix or 60 bags of 60 lb. At this volume, delivered ready-mix is usually cheaper and far less work than mixing bags.

Should I use bags or ready-mix for a 8x10 slab?

Ready-mix. Bags for this slab would cost about $293 in material and require mixing 3,600 lb by hand; a delivered order runs roughly $228 and arrives ready to pour.

Nearby sizes

8x8 slab0.79 cu yd at 4"8x12 slab1.19 cu yd at 4"10x10 slab1.23 cu yd at 4"6x8 slab0.59 cu yd at 4"