FigureThePour

Concrete for a 8x8 Slab

A 8x8 slab at 4" thick needs
0.79 cu yd

Order 0.87 yd with 10% waste — or 36 × 80 lb bags / 48 × 60 lb bags.

By thickness

ThicknessCubic yards+10% waste80 lb bagsTypical use
4"0.790.8736Patio, shed pad, walkway
5"0.991.0945Light vehicle traffic
6"1.191.3054Driveway, garage

Bags or the truck?

For this 64 sq ft slab at 4": bags ≈ $234 (36 × 80 lb — that's 2,880 lb of mixing) vs ready-mix ≈ $197 delivered. The truck wins here. Prices are national ballparks — your local quote rules.

Adjust the numbers

Concrete needed
0.79 cu yd

36 × 80 lb bags | with waste: 0.87 cu yd

Common questions

How much concrete do I need for a 8x8 slab?

A 8x8 slab at the standard 4-inch thickness needs 0.79 cubic yards of concrete — order 0.87 yards with a 10% waste margin. At 6 inches it needs 1.19 yards.

How many bags of concrete for a 8x8 slab?

At 4 inches thick: 36 bags of 80 lb concrete mix or 48 bags of 60 lb. At this volume, delivered ready-mix is usually cheaper and far less work than mixing bags.

Should I use bags or ready-mix for a 8x8 slab?

Ready-mix. Bags for this slab would cost about $234 in material and require mixing 2,880 lb by hand; a delivered order runs roughly $197 and arrives ready to pour.

Nearby sizes

6x8 slab0.59 cu yd at 4"8x10 slab0.99 cu yd at 4"6x6 slab0.44 cu yd at 4"4x8 slab0.40 cu yd at 4"